Verified by a human · 11 July 2026Do you need an HMO licence in High Peak?
You need a mandatory HMO licence if your High Peak property houses 5 or more people from 2 or more households sharing facilities. High Peak does not currently run an additional or selective licensing scheme, so 3–4 person HMOs are unlicensed. Management regulations and room standards still apply to them.
Licensing schemes in force
Mandatory HMO licensing
Applies district-wide to HMOs with 5+ occupants forming 2+ households. National scheme under the Housing Act 2004, Part 2. It has no end date and never lapses.
Additional licensing
No additional scheme currently operates in High Peak. Smaller HMOs (3–4 occupants) do not need a licence. We track consultations, so this page updates if that changes.
Selective licensing
No selective scheme is in force. Selective licensing covers all privately rented homes in a designated area, not just HMOs.
Council summary: Mandatory licensing (Properties let to 5 or more unrelated persons living as two or more separate households who share bathroom or cooking facilities, regardless of number of storeys).
Article 4 direction
No Article 4 direction removes permitted development rights for HMOs in High Peak, so converting a family home (C3) to a small HMO (C4) does not normally need planning permission. Large HMOs of 7+ occupants are sui generis and always need permission.
Licence fees (2026)
| Application | Fee | |
|---|---|---|
| New licence | £450 | |
| Renewal | £350 | |
| Validity | 5 years |
Many councils split payment into two stages following the Gaskin ruling. The figures above are totals.
Track your High Peak HMO
HMOJO maps these rules onto your actual property, room by room, and reminds you before anything lapses. Free for your first property.
Start freeRoom sizes and amenity standards
| Standard | Requirement | Source |
|---|---|---|
| Bedroom, 1 adult | 6.51 m² minimum | National (mandatory condition) |
| Bedroom, 2 adults | 10.22 m² minimum | National (mandatory condition) |
| Bedroom, child under 10 | 4.64 m² minimum | National (mandatory condition) |
Local standards are where councils differ most, and they change without notice. Confirm with High Peak council before letting a room.
What you need to apply
- Gas safety certificate (CP12), current
- Electrical installation condition report (EICR), within 5 years
- Fire alarm and emergency lighting test certificates
- Floor plan with room sizes marked
- Fit and proper person declaration
- Energy performance certificate (EPC), E or above
What changed
- Page verified against current council sources.
- Renters' Rights Act commencement. Periodic tenancies noted in guidance.
High Peak HMO questions, answered plainly
Do I need an HMO licence in High Peak?+
You need a mandatory HMO licence if your High Peak property houses 5 or more people from 2 or more households sharing facilities. This is the England-wide mandatory rule under the Housing Act 2004. High Peak does not currently run an additional or selective licensing scheme, so 3–4 person HMOs are unlicensed. Management regulations and room standards still apply to them. Confirm the current position with the council before accepting tenants.
How much does an HMO licence cost in High Peak?+
A new mandatory HMO licence in High Peak costs £450, and renewal costs £350. The licence runs for 5 years. Fees change with council budgets, so confirm before applying.
Does High Peak have an Article 4 direction for HMOs?+
No. There is no Article 4 direction in force in High Peak, so converting a house to a small HMO (C3 to C4) does not normally need planning permission. Large HMOs of 7 or more occupants are sui generis and always need permission.
What are the minimum room sizes for an HMO in High Peak?+
National minimums apply: 6.51m² for one adult, 10.22m² for two adults, and 4.64m² for a child under 10. Rooms under 4.64m² cannot be used for sleeping. High Peak may also apply local amenity standards for kitchens and bathrooms, so check before letting.
What happens if I run an unlicensed HMO in High Peak?+
Operating a licensable HMO without a licence is an offence under section 72 of the Housing Act 2004. The council can prosecute (unlimited fine) or issue a civil penalty of up to £30,000 per offence. Tenants can claim back up to 12 months of rent through a Rent Repayment Order, and Section 21 notices are invalid while the property is unlicensed.
Neighbouring councils
Know where your High Peak HMO stands.
HMOJO maps these rules onto your actual property, room by room, and reminds you before anything lapses. Free for your first property.
Sources
- High Peak council HMO licensing pages (checked 11 July 2026)
- Housing Act 2004, Part 2 (mandatory licensing framework)